Saturday, September 11, 2010

Slab ready to pour

Wow - progress is great. Our waffles and reinforcing was delivered on Friday as expected.  We had been told by our concreter that he wanted to pour on Monday but we thought that was not possible.  We were greatly surprised to find today at 2.00pm that the plumbing had been done and the slab prepared.  We even met the Engineer on site who came in specially to approve it - they don't normally work on Saturdays. 


Slab ready to pour