McDonald Jones - Beach House at Stonecutters Ridge
Monday, September 20, 2010
Stormwater and sewer connected
Our plumbers arrived at 7.30am to dig the trenches for the stormwater and sewer pipes. They also ran pipes for the water and recycled water from the boundary to the slab. Great weather for building!
No comments:
Post a Comment